Laboratory EngineeringGuide
Laboratory integration architecture & authority
Follow an authorized Program order through transport, laboratory acceptance, specimen handling and clinical release.
On this page
Current availability — October 25, 2026
HTTPS/JSON using the Solia Lab Contract is the executable Sandbox integration path. Native REST, FHIR R4, HL7 v2/MLLP, SFTP and Edge have source and isolated tests, but native execution is disabled and no deployed native installation authority is established. A selected test pass is not permission to connect a real laboratory.
Important
Production promotion remains paused. Configuration, imported Live status, payment and technical validation do not authorize Production or publication.
One canonical lifecycle
Current scoped buyer credential + Program grant
→ canonical catalog / clinical / collection checks
→ canonical order and attribution
→ installation-bound native transmission
→ transport receipt (not application acceptance)
→ explicit LIS application ACK / rejection
→ accession and individual specimen events
→ result revision and independent clinical evaluation
→ authorized release
→ scoped Partner result GET / webhook notificationThe order, transmission, kit barcode, accession and result revision are distinct identities. A callback must correlate to the existing authorized order; it cannot create a replacement order or infer a missing accession.
Step 5, Step 6 and go/no-go
- Identify the laboratory system and choose the supported path in Step 5; product selection is descriptive, not configured or certified.
- Record the technical handoff and current mapping evidence; managed request progress is not an ACK/result proof.
- Obtain current canonical Sandbox order, acknowledgement and result evidence for Step 5 completion.
- Read Step 6 technical readiness freshly in the selected environment; missing, failed or refreshing evidence fails closed.
- Treat commercial activation, authorized Production validation and release approval as separate requirements; do not bypass paused promotion.
If installed authority is absent, stop at configuration/review and synthetic acceptance. Keep existing evidence and ask the authorized owner for the missing approval, rather than adding a second order pipeline.